Bill Moses Maritime Consultants

Maritime Consultants specialising in the Ferry Industry

  • Home
  • Maritime Consulting Services
    • Maritime Consulting Services
    • Commercial Consultancy
    • Passenger Consultancy
    • Retail and F&B
    • Freight
    • Marine Technical
    • Vessel Sourcing
    • Communication Consultancy
    • Maritime Security Consultants
  • About Bill Moses
  • Company Profile
    • Case Study: Terminal Design
  • Blog
  • Contact

Smooth sailing for Stena Jutlandica battery project

October 24, 2018 by the News Team

The Stena Jutlandica has now completed its first month of operation as a battery hybrid vessel and the positive experiences from the first weeks of service have exceeded expectations.

“It’s really exciting to be running with electrical power on the Stena Jutlandica. This project is an important part of our focused efforts to find ways of reducing our impact on the environment.  As both the size and cost of batteries decrease, battery operation is becoming a very attractive alternative to traditional fuel for shipping as it should be possible to completely eliminate emissions in the future,” says Erik Lewenhaupt, Head of Sustainability at Stena Line.

The battery project is being carried out in steps. Step One, which is presently underway, is about switching to electrical operation to reduce the use of diesel generators, as well as for maneuvering and powering the bow thrusters when the ship is in port.

In Step Two, battery power will be connected to two of the four primary machines, which means that the Stena Jutlandica will be able to run on electrical power for about 10 nautical miles inside the archipelago out to Vinga Lighthouse (Gothenburg, Sweden).

During Step Three, all four primary machines will be connected to the batteries and the ship will be able to cover the 50 nautical miles between Sweden and Denmark solely on electrical power.  A number of positive effects have already been noted after just one month.

“We’ve been able to significantly reduce our use of the diesel generators and now only need to use one instead of three. Another positive effect concerns safety.  Having constant access to electricity, we minimize the risk for power outages”, says Johan Stranne, Senior Chief Engineer on the Stena Jutlandica.

In Step One alone, the environmental savings from using battery power for reduced generator usage and maneuvering in port amounts to approximately 500 tons of fuel saved and 1,500 tons of reduced CO2. This corresponds to the annual emissions from approximately 600 cars.

The rationale for execution in multiple steps is to enable testing and assessment while the project is underway. If the project is successful, battery power can be considered for other vessels within the Stena Line fleet. Work on Step Two has begun and the goal is for implementation within approximately three years.

The technical solutions in Step One have been developed by Stena Teknik in collaboration with the Callenberg Technology Group, with half of the funding for the project coming from the Swedish Transport Administration and the EU.

 

Filed Under: News Tagged With: battery, electric power, Gothenburg, Stena Line

Latest News

  • P&O Ferries orders two new super-ferries for Dover-Calais
  • Serco awarded £450m contract for Northern Isles Ferry Services
  • Carnival receives approval for major expansion of Terminal F at PortMiami
  • Red Funnel wins prestigious Maritime 2050 Award
  • MSC unveils details of MSC Seashore
  • New Calais to Tilbury service for P&O Ferries

twitter-24 Follow us on Twitter

Contact Bill Moses Maritime Consultation Services

    I consent to Bill Moses Maritime Consultation Services using my information in relation to dealing with my enquiry. Full details of how we use your information can be found in our Privacy Policy.

    Copyright © 2026 Bill Moses | Images © Peter Barker, & others | Privacy Policy | Trading Terms & Conditions